EPC & Commissioning
We take complex automation projects from engineering concept to a tested, operational system with one team responsible for delivery
Delivery timeline
12–28 weeks
Project structure
Milestone-based
Delivery model
End-to-end delivery


What's included
One accountable path from concept to production.
We coordinate the technical, commercial, and site activities needed to turn a project plan into a working facility.
01
Front-end engineering
We define requirements, layouts, interfaces, specifications, and the delivery plan before equipment arrives.
01
Front-end engineering
We define requirements, layouts, interfaces, specifications, and the delivery plan before equipment arrives.
02
Supplier management
We coordinate manufacturers, fabricators, integrators, and specialist contractors throughout the project.
02
Supplier management
We coordinate manufacturers, fabricators, integrators, and specialist contractors throughout the project.
03
Site execution
Installation activities are planned and coordinated across mechanical, electrical, and automation scopes.
03
Site execution
Installation activities are planned and coordinated across mechanical, electrical, and automation scopes.
04
Integration testing
Equipment and control systems are tested together before production startup to identify issues early.
04
Integration testing
Equipment and control systems are tested together before production startup to identify issues early.
05
Start-up & ramp-up
We bring the system online, tune performance, resolve commissioning issues, and support production ramp-up.
05
Start-up & ramp-up
We bring the system online, tune performance, resolve commissioning issues, and support production ramp-up.
06
Project closeout
As-built documentation, test records, training, and final handover complete the project.
06
Project closeout
As-built documentation, test records, training, and final handover complete the project.
How we work
From the first site walk to lasting uptime
01
Scope & survey
We walk your floor, define the problem before discussing price.
01
Scope & survey
We walk your floor, define the problem before discussing price.
02
Engineer & quote
Detailed design, fixed timeline, transparent pricing.
02
Engineer & quote
Detailed design, fixed timeline, transparent pricing.
03
Build & commission
We fabricate, install, and start up around your schedule.
03
Build & commission
We fabricate, install, and start up around your schedule.
04
Support & optimize
Ongoing support and system optimisation.
04
Support & optimize
Ongoing support and system optimisation.

The proof
Our case studies
Answers
Answers to common questions
Do you manage the project from engineering through commissioning?
Yes. We coordinate engineering, equipment procurement, installation, controls, testing, and commissioning through to production handover.
Can you coordinate multiple equipment vendors?
Yes. We can act as a central point of coordination between equipment suppliers, integrators, contractors, and your internal team.
What happens during commissioning?
We test equipment, verify control sequences, tune the process, check safety functions, resolve issues, and prepare the system for production.
Do you provide operator training?
Yes. Training can cover normal operation, basic troubleshooting, changeovers, and essential system procedures.
Do you manage the project from engineering through commissioning?
Yes. We coordinate engineering, equipment procurement, installation, controls, testing, and commissioning through to production handover.
Can you coordinate multiple equipment vendors?
Yes. We can act as a central point of coordination between equipment suppliers, integrators, contractors, and your internal team.
What happens during commissioning?
We test equipment, verify control sequences, tune the process, check safety functions, resolve issues, and prepare the system for production.
Do you provide operator training?
Yes. Training can cover normal operation, basic troubleshooting, changeovers, and essential system procedures.